Topic – Network Rail – FOI Documents

GVG Requested details from Network Rail on the background to the decision making concerning the Station, particularly the decisions made concerning Platform 0.  Having looked at the Documents we have considerable concerns on the Capacity and Resilience of the station for the future.

In particular the Solum development probably has a design life of over 100 years so it should be located to allow potential growth at the station.

This has resulted in GVG writing to Secretary of State Chris Grayling.

Click Here – For Letter to Chris Grayling

Click Here – FoI Response letter from Network Rail

Click Here – Timetable Analysis May 2018 – this includes reduced traffic on New Line from previous studies

Click Here – Network Rail Report on Options for Platform 0 at the Station 2014

Click Here – Network Rail Pre GRIP Feasibility Report – Guildford Station December 2014

Click Here – Network Rail Supporting Diagrams of Guildford Station

As background Click Here for the GVG Station Study September 2018 prepared before we received the FOI material